Macau Casino

Synchronizing of genset / run up synchronizing
  • Run-in synchronizing system which requires all 8 x 2275KVA 11KV genset to be sync at one go within 10 secs.
  • The system also requires back sync with multiple transformer without break during utility resume (close transition transfer).